Sunday, December 6

Pizza at 2:30pm, meeting starts 3:00pm

Agenda

1. Vote on 2027 proposed church budget

2. Vote on church renovations

Renovations History

April 2025 – Congregation survey conducted: How can we more efficiently use the space God has blessed us with?

May 2025 – Survey results informed the scope of work; scope of work voted at business meeting

December 2025 – Three concepts presented at business meeting; voted to proceed with selected concept (see initial renderings below)

Throughout 2026 – Ongoing collaboration with architect and city on detailed design phases

December 2026 – Final renderings, timeline, and total cost to be presented. Final vote needed to determine whether to proceed

Final Exterior and Vestibule

Proposed Interior Vestibule (Lobby)

Proposed Interior Vestibule (Lobby)

SCOPE OF WORK: Adding ADA Compliance & Accessibility & Upgrading School Building

Parking Lot
  • Excavation between church back entrance and school entrance, and into first double parking space
  • New concrete with footings for a new vestibule (see below), joining the entrances to all 3 buildings
  • Add roof and secure door to the north white brick wall, to store outside maintenance equipment & city refuse bins
  • A/C condensers will be repositioned to be parallel with the gym/school, on a raised bed, with landscaping up to the new entrance door
    • A/C condensers will have a new enclosure
  • Church north wall venting pipes will be repositioned
  • Dumpster enclosure will be added next to the glass block window, turned, with front facing south
  • Current pastor’s parking space will become a handicap space
  • Single parking spaces will be relined, with last space ending at the sidewalk
  • The end result will be 18 parking spaces
Church Back Entrance
  • Replace entire back stairway, from balcony down to fellowship hall
  • Remove current backdoor and wall
  • Add a LULA (Limited Use/Limited Application) elevator, from sanctuary level down to fellowship hall
    • 3 stops: sanctuary (upper lobby), ground (lower lobby), fellowship hall
  • Replace west balcony wall, balcony floor, and east and west doors replaced with fire-rated doors
  • Nursery back door will be replaced by a wall, and the sanctuary door will be replaced with a new fire-rated door
  • A built-in counter, with lower cabinet, and bench will be added in the sanctuary (upper) lobby
  • A built-in bench will be in the ground (lower) lobby
Fellowship Hall / Church Basement
  • Remove current stairway and the old ladies’ restroom
  • Excavate beyond the old restroom to go under current ground level alcove
  • New stairway between ground (lower lobby) and fellowship hall
  • New elevator lobby and mechanical closet
  • Add a storage room, between kitchen and the new lobby
  • New fire-rated door, with slit window, between lobby and main hall area
Gym
  • Remove door between church & gym and remove current double doors to the alcove
  • Remove storage room and install an extra wide single fire-rated door, with slit window, closer to the school wall, for the new gym entry, from the vestibule
School Kitchen
  • Renovation to be a commercial kitchen
  • West wall will have counter, with upper & lower shelves & drawers, warmer, and double range/oven with hood
  • North wall will have 3 sinks and a separate hand-washing sink and wall shelving
    • North wall will be at least partially replaced for plumbing work
  • East wall will have commercial size refrigerator and freezer
  • South wall will have existing serving window and counter, with upper & lower shelving, and drawers
  • New walls, new ceiling proposed/repair & paint damaged existing concrete plank ceiling, and floor will be refinished
  • Add outlets
  • Current door remains
Current Ladies Bathroom
  • All dividers, stalls, and fixtures will be removed
  • Hallway wall, to near the water fountain, will be removed
  • The single door will be replaced with double doors
  • New walls, paint existing concrete plank ceiling, and floor will be refinished
  • Will be a storage room for tables & chairs racks, 2 Community Center inside bins, gym equipment, and ladders
Right of the Water Fountain
  • Wall will be replaced with a Janitor Closet
  • Closet will contain an electric ventless all-in-one washer dryer, mop sink, and shelving
  • Double doors
Current Men’s Bathroom
  • All dividers, stalls, and fixtures will be removed
  • Wall between current bathrooms will be replaced and all plumbing replaced
  • Current door and wall, to electrical box, will be removed
  • New 2 single, non-gender, ADA bathrooms will be installed, both with a changing table
  • New walls, paint existing concrete plank ceiling, and floor will be refinished
North Room
  • Carpet will be replaced with plank flooring same/similar to the children’s church room
  • Walls will be painted same as the children’s church room
  • More outlets will be added
  • Replace baseboard heating vent covers
  • An accordion wall will be added, where the old cinderblock wall used to be
  • Both sinks will be made functional and will be replaced with new sinks/counters
Children’s Church Room
  • Both doors will be replaced with 1/2 glass fire-rated doors
New Vestibule
  • Exterior: New lower lobby will be a red brick wall with a large circle window in the middle
  • Exterior: New storefront windows & red brick wall, between lower lobby and school entrance, at an angle
  • Exterior: New storefront double doors entrance, with an overhang above it and added red brick wall north of it
  • Exterior: Community Service donation bin will be moved to outside the glass block window
  • Exterior: New red brick pitched roof over new lobbies, expanding depth and width of the space, with a north horizontal window, and shingle roof
  • Exterior: School roof will be extended out over vestibule
  • Exterior: New roof, will be above (not on) children’s church room roof, for ducts
  • Interior: An inside support column will be added, between the circle window and storefront windows
  • Interior: Support columns will be added on outside of the children’s church room, between windows, ends, and at turn
    • Brick wall will be covered, hiding support columns
  • Interior: HVAC will be added, above lower lobby ceiling, near new gym door
  • Interior: Required sprinkler system and fire alarm will be added in new lobbies and vestibule
  • Interior: A long angled stationary bench will be along a portion of the inside of the storefront windows
  • Interior: School entrance doors will be replaced with fire-rated doors with slit windows
  • Cameras will be installed throughout the outside and inside of new vestibule and lobbies
Project End
  • Add a wood coat rack on the wall across from new ADA bathrooms
  • Remove the school basement wall, between the first classroom and storage room
  • Install sound boards around the top half of the gym
  • School hallway floor will be refinished and sealed – very last task

 

 

 

Lakewood Seventh-day Adventist Church
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.